Project
Objectives
• |
|
Development of an innovative multilateral geothermal well design capable of enhancing flow performance of 30-100% for new doublet systems suited for different reservoir types, at limited additional costs |
• |
|
Development of robust, yet practical simulation approaches and fast models to calculate the techno-economic performance for the advanced well design, which can be used for benchmarks and further improvement of the well concept |
• |
|
Enhance well design by drilling and learning in different stages of geothermal development: |
|
|
- Stand-alone exploration and appraisal, learning while drilling. |
|
|
- Portfolio exploration: enhance the performance of remaining prospects in a portfolio by using information of the last developed optimized designs. |
|
|
- Field production: enhance the performance and lifetime of existing/new wells based on field learning |
• |
|
Field scale demonstration of the innovative well design and the drill and learn update procedure in a geothermal doublet development. |
• |
|
Development of an innovative multilateral geothermal well design capable of enhancing flow performance of 30-100% for new doublet systems suited for different reservoir types, at limited additional costs |
WORKPACKAGES
Timeline
September 2020 - August 2025